
Project
Secondary Containment, Fuel Storage Area, Hawaiian Electric Company
Hawaii · 2009
Overview
The installation
Lining of a fuel-storage secondary containment area including walls, floor, and tank ring wall, using the same materials family as the adjacent methane-barrier project.
Planning a similar installation
Include the site location, stored liquids, containment layout, wall and tank-base details, liner specification, and construction access.
Agree on the field testing and closeout records before mobilization. ECA's documented QA/QC program includes panel layout maps, seam records, test results, and field logs.
Review ECA's quality control and safety recordRead the SPCC containment planning guideThis project is an example of our secondary containment work.
Request a QuoteProject facts
- Location
- Hawaii
- Year
- 2009
- Service
- Secondary Containment
Materials installed
- 45 Mil XR-5 geosynthetic liner
- 12 oz geotextile
- 1000 LF stainless-steel mechanical attachment
Our Work
See more of what our crews install
Every install is engineered, fabricated, and field tested by EC Applications. Tell us about your site and we will share the most relevant references.
