Methane Barrier, Hawaiian Electric Company, installed by EC Applications

Methane Barrier, Hawaiian Electric Company

Hawaii · 2009

The installation

A 600,000 SF biogas cover and passive methane barrier installed over an existing lagoon in multiple phases, coordinated across simultaneous contractor crews. The installation included over 150 penetrations through the liner. All seams were vacuum tested and the installation was smoke tested for a leak-proof system.

Planning a similar installation

Include the site location, approved mitigation plans, specified membrane, penetration details, inspection requirements, and slab schedule.

Agree on the field testing and closeout records before mobilization. ECA's documented QA/QC program includes panel layout maps, seam records, test results, and field logs.

Review ECA's quality control and safety record

This project is an example of our methane barriers work.

Request a Quote

Project facts

Location
Hawaii
Year
2009

Materials installed

  • 45 Mil XR-5 geosynthetic liner
  • 12 oz geotextile
  • 1000 LF stainless-steel mechanical attachment

See more of what our crews install

Every install is engineered, fabricated, and field tested by EC Applications. Tell us about your site and we will share the most relevant references.