Hazardous Waste Landfill- US Ecology
Location Beatty, Nevada
Customer Las Vegas Paving Corporation.
Completed July 2008
   

Project Scope: Multiple layer Liner system with over 1,700,000 SF of Geosynthetic materials. Nearly vertical Slopes (0.5:1)

The liner system consisted of:

  • Geosynthetic Clay Liner.
  • Double Sided HDPE
  • Single Sided Geo-Composite.
  • Single Sided Textured HDPE liner
  • 200 Mil Geonet
  • 16oz Geotextile
  • 30 Mil Smooth HDPE.

ECA completed the project for Las Vegas Paving Corp, in July of 2008.

The project was built under extreme weather conditions. Nearly 115 degrees Fahrenheit was the average temperature during the day. The temperature inside the cell reached 135 degrees making it challenging for our crews. ECA completed the project ahead of schedule without any accidents or incidents. This project was extremely important to US Ecology and needed to be completed under a tight schedule. ECA met all of the project goals.

  • images/large/ue-large-1.jpg Orange Fish
  • images/large/ue-large-2.jpg Sea Turtle
  • images/large/ue-large-3.jpg Orange Fish
  • images/large/ue-large-4.jpg Sea Turtle
  • images/large/ue-large-5.jpg Orange Fish
  • images/large/ue-large-6.jpg Orange Fish

Statement of
Qualifications
CONTACT US

ECApplications

901 East Orangethorpe Avenue
Anaheim, CA 92801

Phone : (714) 921-9848
Fax : (866) 475-1225
Email : info@ecapplications.com