EC Applications
  • Home
  • Careers
  • Experience
    • About us
  • Services
    • BAFFLE CURTAINS
    • EPS LIGHTWEIGHT FILL
    • FLOATING COVERS
    • LANDFILL
    • METHANE BARRIER
    • MINING
    • OIL & GAS CONTAINMENT
    • SECONDARY CONTAINMENT
    • SPECIALTY FABRICATION
    • TUNNELS
    • WASTEWATER CONTAINMENT
    • WATER RESERVOIRS
  • Our Projects
    • Hillarides Bio-Gas Covers
    • Methane Barriers
    • Secondary Containment
  • Contact
  • Home
  • Portfolio

Portfolio

hb-large-2-1.jpg

Secondary Containment (Fuel Storage Area)

Lining of containment area including walls, floor and tank ring wall.

ECA completed this project utilizing EFI’s latest technology in Anaerobic Digesters. This is one of the biggest Biogas Covers in California and captures enough methane gas to power six 125 KW generators. Hilarides Previously experimented with the capture and utilization of Biogas by partially covering one of the lagoons and extracting enough gas to power up a generator. In 2004 Hilarides built the first Biogas Cover using EFI’s technology. In 2008 ECA built the second Biogas Cover and it is currently producing enough gas for the six 125 KW generators. Rob Hilarides has recently embraced another project and is now converting raw biogas in to Compressed Natural Gas for use in his farm equipment and transportation trucks. Rob Hilarides has turned the Biogas Covers into successful projects and continues to have the vision for innovation. A video of his CNG can be seen in a video featured in you tube http://www.youtube.com/watch?v=lIkEm8JUOfY To learn more about Biogas Generation and Utilization please visit us at www.Biogascovers.com

CONTINUE READING

hb-large-2-1.jpg

METHANE BARRIER

Passive methane barrier system installation

ECA completed this project utilizing EFI’s latest technology in Anaerobic Digesters. This is one of the biggest Biogas Covers in California and captures enough methane gas to power six 125 KW generators. Hilarides Previously experimented with the capture and utilization of Biogas by partially covering one of the lagoons and extracting enough gas to power up a generator. In 2004 Hilarides built the first Biogas Cover using EFI’s technology. In 2008 ECA built the second Biogas Cover and it is currently producing enough gas for the six 125 KW generators. Rob Hilarides has recently embraced another project and is now converting raw biogas in to Compressed Natural Gas for use in his farm equipment and transportation trucks. Rob Hilarides has turned the Biogas Covers into successful projects and continues to have the vision for innovation. A video of his CNG can be seen in a video featured in you tube http://www.youtube.com/watch?v=lIkEm8JUOfY To learn more about Biogas Generation and Utilization please visit us at www.Biogascovers.com

CONTINUE READING

ECApplications-Corporate

901 East Orangethorpe Avenue Anaheim, CA 92801 Office : (714) 921-9848 Fax : (866) 475-1225

ECA Texas

9516 W County Road 60 Midland, TX 79707 Office : (432) 614-3001

ECA Reno

255 Distribution Drive Unit 206 Sparks, NV 89441 Office : (775) 549-3010 Fax : (775) 345-3560

LICENSED CONTRACTOR

Erosion Control Applications, INC CSLB# 894068 EC Applications, LLC CSLB# 1003207